The new playground at the port of La Savina opened to the public yesterday. The playground, paid for by the Balearic Port Authority (APB), is located on the Paseo de la Marina, next to the Formentera Mar tower. The newly opened space covers an area of 225 square meters, is designed for children between five and twelve years old and has an arch, a slide, a climbing frame, a bridge, a swing and a balance beam. As reported by the APB, in addition to complying with all European safety standards, the facilities have been purpose-built with materials resistant to maritime environments. The work was carried out in a joint venture by Parrot Asfaltomeros and cost more than 72,000 euros. The project, reported the APB, is part of an initiative to improve the condition of the roads and pedestrian access area to the port of La Savina. This series of measures includes the improvement of gardening, paving, signage, lighting, bike lanes and viewpoints.
Port of La Savina playground opens
Related Content
Tourist arrested for kicking and smashing a 300,000 euro statue in Ibiza
The Civil Guard has arrested a german tourist as alleged perpetrator of a crime of…
2025-07-08A bench to the rhythm of ‘Bohemian Rhapsody’ – where Freddie Mercury took refuge and partied
Ibiza has luxury, celebrity and bench in its DNA. Current refuge of soccer players in…
2024-07-06Aleix Peman and Jazmn Deza, Ibiza’s two finest competitors in the Balearic ILCA-4 class
Following this test, both sailors from Club Náutico Ibiza are one step closer to being…
2022-01-19Cuina Central Ibiza will distribute 5,500kg of food over 2 months to 69 families
Chef David Reartes created the project, which includes the Eivissa Town Council, Catering s'Olivera, Ibiza…
2021-09-15